Quick answer: To lay out stairs, divide the total rise by a target riser height and round to a whole number of risers, then divide the rise by that number for the exact riser height; treads are one fewer than risers. A 108 in rise with a 7.25 in target gives 15 risers of 7.2 in, 14 treads and a 147 in total run.
Your measurements
Total riseTread runRiser
Stair profile: total rise divided by the riser height gives the number of steps; treads set the total run.
Results update as you type. The link in your address bar saves these entries.

Results

Risers
15 risers
Each 7.2 in, within IRC limits
Treads
14 treads
10.5 in deep, 3 ft wide
Total run
147 in
12.25 ft of floor space
Stringer length
15.2 ft
Buy 3 x 18 ft 2x12s to allow for the top and bottom cuts
Stair angle
36.3 degrees
30 to 37 degrees is the comfortable range

Stair formula

Risers = Total rise / target riser height, rounded to the nearest whole number
Actual riser height = Total rise / Risers
Treads = Risers - 1;  Total run = Treads x tread depth
Stringer length = sqrt(Total rise² + Total run²)

Worked example

A basement stair with a 114 in floor-to-floor rise, a 7.5 in target riser and 11 in treads: 114 / 7.5 = 15.2, so 15 risers of 7.6 in. That gives 14 treads and a total run of 14 x 11 = 154 in. Stringer length is sqrt(114² + 154²) = 191.6 in, or 16 ft, so buy 18 ft 2x12s to leave room for the top and bottom cuts.

Quick reference

Stair layout by total rise (7.25 in target riser, 10.5 in treads)
Total riseRisersRiser heightTreadsTotal run
96 in (8 ft)137.38 in12126 in
102 in147.29 in13136.5 in
108 in (9 ft)157.20 in14147 in
114 in167.13 in15157.5 in
120 in (10 ft)177.06 in16168 in

How to calculate stair rise and run

Start with the total rise, measured from finished floor to finished floor. Stairs are framed before the flooring goes down, so measure subfloor to subfloor and add the thickness of both finishes. Divide by the riser height you would like, round to a whole number, and divide again to get the exact riser. IRC R311.7.5.1 allows 3/8 in between the tallest and shortest riser in a flight; a 3/4 in surprise at the top fails inspection and trips people.

Multiply the treads (one fewer than risers) by the tread depth for the total run. Then check headroom: 6 ft 8 in measured plumb from the nosing line to the ceiling or floor framing above (R311.7.2). If the run does not fit, a landing at least 36 in in the direction of travel turns the stair (R311.7.6). No flight may rise more than 151 in between landings (R311.7.3).

Cutting and hanging stringers

Lay out the rise and run on a 2x12 with a framing square and stair gauges. Drop the bottom of the stringer by the tread thickness so the first step is not taller than the rest once the treads go on. At least 5 in of solid wood must remain at the throat of each notch. A 7-3/4 in rise with an 11 in run on a 2x12 leaves under 5 in, so switch to 1-3/4 x 11-7/8 in LSL or add a center stringer.

Hang the top on a hanger board or stringer hangers, never on toe-nails, and anchor the bottom to a 2x4 kicker, treated on a slab. Any flight with four or more risers needs a handrail 34 to 38 in above the nosings, continuous, 1-1/2 in off the wall, ends returned (R311.7.8). A graspable rail is 1-1/4 to 2 in round or a Type II profile with a finger recess; a 2x4 does not qualify. Open sides more than 30 in above the floor need a guard, 34 in minimum on the stair and 36 in on landings (R312.1). Guard openings must stop a 4 in sphere.

What this calculator leaves out

Treads and risers (1 in hardwood or 5/4 stock inside, 2x12 for a deck), skirt boards and the landing frame. Also the hanger board and stringer hangers, kicker and anchors, handrail with brackets and wall blocking, guards and balusters, and the permit. It does not check headroom, which depends on where the floor opening ends.

Code limits that apply

  • IRC R311.7.5.1checked

    Riser 7.75 in max; no more than 3/8 in variation between risers in a flight

    If you miss it: One tall closer at the top after flooring goes down; the inspector measures every riser

  • IRC R311.7.5.2checked

    Tread depth 10 in min, nosing to nosing; no more than 3/8 in variation in a flight

    If you miss it: Short treads land the heel off the step on the way down; the fix is recutting every stringer

  • IRC R311.7.3checked

    No flight rises more than 151 in (12 ft 7 in) between floors or landings

    If you miss it: A tall basement run needs a landing framed in after the stringers are cut, or the flight is torn out

  • IRC R311.7.1checked

    36 in min clear width above the handrail; 31-1/2 in at handrail height with one rail

    If you miss it: A 36 in rough opening finishes under 36 in once drywall and skirts go on; the wall or the stair moves

  • IRC R311.7.2

    6 ft 8 in headroom measured plumb from the nosing line to the ceiling or framing above

    If you miss it: The floor opening above ends too soon and the header clips headroom; the fix is reframing the floor

  • IRC R311.7.8

    Handrail on 4 or more risers, 34 to 38 in above nosings, continuous, graspable, ends returned

    If you miss it: A 2x4 on brackets or an open rail end gets tagged; no blocking in the wall means opening finished drywall

  • IRC R312.1

    Guard on open sides over 30 in drop, 34 in min on stairs, 36 in on landings; 4 in sphere rule

    If you miss it: Balusters laid out at a full 4 in pass a sphere once the wood shrinks; every one gets pulled and respaced

Rows marked checked produce a warning in the results when an entry crosses the limit. The others are on the plans or on site and this calculator does not test them. Local amendments can be stricter; the adopted edition and the inspector govern.

Mistakes that cost money

  • Measuring rise subfloor to subfloor: 3/4 in of flooring on one floor only puts the top riser 3/4 in off, twice the 3/8 in allowed.
  • Not dropping the stringer by the tread thickness: the bottom step comes out 1 in taller than the rest and fails the 3/8 in rule.
  • Toe-nailing stringers to the rim joist: hang the top on a hanger board or stringer hangers and anchor the bottom to a kicker.
  • Under 5 in of throat on a 2x12: a 7-3/4 in rise with an 11 in run gets there; use LSL or add a stringer.
  • A flat 2x4 or 2x6 handrail fails IRC R311.7.8.5; use a 1-1/4 to 2 in round or a stock graspable profile, returned to the wall.
  • Stringers sitting on a bare basement slab: the bottoms wick water and rot; set them on a treated 2x4 kicker anchored to the slab.

Key facts

  • The IRC limits residential risers to 7.75 in maximum and treads to 10 in minimum (R311.7.5), with no more than 3/8 in variation between steps.
  • A comfortable stair follows the rule that 2 x riser + tread is between 24 and 25 in.
  • Treads are always one fewer than risers because the top floor acts as the last tread.
  • Stringers are cut from 2x12s; a 36 in wide stair needs three stringers when treads are 1 in thick.
  • Minimum headroom over the stair is 6 ft 8 in measured plumb from the tread nosing (IRC R311.7.2).

Frequently asked questions

How many steps for a 9 foot ceiling?

With a typical 108 to 110 in total rise you need 15 risers of about 7.2 in and 14 treads. The exact count depends on the floor-to-floor height including joists and flooring.

What is the standard rise and run for stairs?

A 7 to 7.5 in riser with a 10 to 11 in tread. The IRC allows up to 7.75 in risers and requires at least 10 in treads for residential stairs.

How long of a 2x12 do I need for stair stringers?

Compute the diagonal of total rise and total run, then add about a foot for the plumb and level cuts. A 108 in rise with a 147 in run needs a 15.2 ft stringer, so buy 18 ft 2x12s to leave room for the cuts.

Do I need a handrail on my stairs?

Yes on any flight with four or more risers (IRC R311.7.8). Set it 34 to 38 in above the nosings, run it the full flight, keep 1-1/2 in to the wall and return the ends into the wall or a newel. It has to be graspable: 1-1/4 to 2 in round, or a stock profile with a finger groove. A 2x4 on brackets fails. Any open side more than 30 in above the floor also needs a guard with balusters under 4 in apart (R312.1).

Sources and references

Next steps for this project

  1. Post Holes
  2. Floor Joists
  3. Deck
  4. Stairs
  5. Baluster Spacing
  6. Fence
  7. Board feet

The usual order for a framing, decks & fences project. See all framing, decks & fences calculators.

Embed this calculator

Results are estimates based on standard formulas and typical product specifications. Confirm quantities with your supplier and local code before ordering.