Calculate how much sod you need for a new lawn in square feet, rolls or slabs and pallets. Enter the lawn size, waste allowance and pallet coverage.

By CalcBuilt Editorial TeamUpdated September 9, 2026Formulas checked against manufacturer specs, see how we calculate.

Quick answer: To find how much sod you need, multiply the lawn length by width in feet, add any extra areas, then add 5 to 10% for cutting waste. A 50 x 20 ft lawn with 5% waste needs 1,050 sq ft of sod, which is 105 rolls of 2 x 5 ft or 3 pallets at 450 sq ft each.
Your measurements
LengthWidth
Plan view from above: area is length times width.
Results update as you type. The link in your address bar saves these entries.

Results

Sod to order
1,050 sq ft
1,000 sq ft measured plus 5% waste
Number of rolls
105 rolls
10 sq ft each
Pallets
3 pallets
At 450 sq ft per pallet

Sod formula

Lawn area = Length (ft) x Width (ft) + Extra area
Sod to order = Lawn area x (1 + waste %)
Pieces = Sod to order / piece size  (10 sq ft roll, 2.67 sq ft slab)
Pallets = Sod to order / pallet coverage  (usually 400 to 500 sq ft)

Worked example

A 40 x 30 ft back yard plus a 200 sq ft side strip, laid with slabs and 10% waste for the curved beds: 40 x 30 = 1,200 sq ft, plus 200 = 1,400 sq ft. 1,400 x 1.1 = 1,540 sq ft of sod.

At 2.67 sq ft per slab that is 1,540 / 2.67 = 577 slabs. With 450 sq ft per pallet, 1,540 / 450 = 3.4, so order 4 pallets. At $350 per pallet the sod costs $1,400 before delivery.

Quick reference

Sod needed by lawn size (5% waste, 10 sq ft rolls, 450 sq ft pallets)
Lawn areaSod to orderRollsPallets
500 sq ft525 sq ft532
1,000 sq ft1,050 sq ft1053
2,000 sq ft2,100 sq ft2105
5,000 sq ft5,250 sq ft52512
10,000 sq ft10,500 sq ft1,05024

How to calculate sod

Measure the length and width of each lawn section in feet and multiply for square feet. Break odd shapes into rectangles and add them together, or enter the extra pieces separately. Then add 5 percent for a simple rectangle or 10 percent when there are curves, trees and walkways to cut around.

Sod is sold by the roll, slab or pallet. Suppliers usually prefer to sell whole pallets, and the pallet size varies by farm, so confirm the coverage before you order. A 450 sq ft pallet is common, but 400 and 500 sq ft pallets are also sold.

Laying sod

Prepare the soil first: remove old grass, grade the area, spread 4 to 6 inches of topsoil if the existing soil is poor, and rake it smooth about 1 inch below walkways so the sod sits flush. Have the sod delivered the day you plan to lay it.

Start along the longest straight edge and stagger the joints like brickwork. Butt edges tightly without overlapping, use a sharp knife for cuts, and water thoroughly within 30 minutes of laying. Keep it moist for two weeks and avoid heavy foot traffic until it has rooted.

Key facts

  • A standard sod roll is 2 x 5 ft and covers 10 sq ft; a pallet holds 45 to 50 rolls (450 to 500 sq ft).
  • A pallet of sod weighs 1,500 to 3,000 lb depending on soil moisture, so it cannot be moved by hand.
  • Sod should be laid within 24 hours of harvest; it starts to yellow after a day on the pallet in warm weather.
  • New sod needs watering every day for the first 2 weeks and roots into the soil in 2 to 3 weeks.
  • Sod costs several times more than seed for the same area but gives a usable lawn in weeks instead of months.

Frequently asked questions

How many square feet does a pallet of sod cover?

Usually 400 to 500 square feet, with 450 square feet the most common. It varies by grower, so ask before you order.

How much waste should I add for sod?

Add 5 percent for a simple rectangular lawn and 10 percent if there are curves, beds or obstacles that need many cuts.

How much does a pallet of sod weigh?

Between 1,500 and 3,000 pounds depending on how wet the soil is. Plan for a forklift delivery or have it dropped close to the lawn.

How long can sod stay on the pallet?

Lay it within 24 hours. In hot weather the inner rolls heat up and can die within a day.

Sources and references

Next steps for this project

  1. Square Footage
  2. Fill Dirt
  3. Topsoil
  4. Sod
  5. Grass Seed
  6. Mulch
  7. French Drain

The usual order for a landscaping & outdoor project. See all landscaping & outdoor calculators.

Results are estimates based on standard formulas and typical product specifications. Confirm quantities with your supplier and local code before ordering.