Quick answer: To find how many pavers you need, divide the area in square inches by the footprint of one paver plus its joint, then add waste. A 12 x 10 ft patio (120 sq ft) with 4 x 8 in pavers and 1/8 in joints needs about 516 pavers, or 542 with 5% waste, over 1.48 cubic yards of gravel base and 0.37 cubic yards of bedding sand.
Your measurements
Unit widthUnit lengthjoint gap
Unit layout: each unit plus its joint is one repeating cell; the count is the area divided by that cell.
Results update as you type. The link in your address bar saves these entries.

Results

Pavers to buy
542 pavers
516 pavers cover the area, plus 5% waste. Order every pallet from one production lot
Gravel base
1.48 cu yd
4 in compacted depth, placed in lifts of 4 in or less; order about 20% more loose
Bedding sand
0.37 cu yd
1 in of coarse concrete sand, screeded, never compacted before the pavers go down
Polymeric sand (50 lb bags)
2 bags
0.125 in joints; one bag fills about 75 sq ft. Sweep in dry, compact, blow the faces clean, then mist
Area
120 sq ft
4.3 pavers per sq ft at 4 in x 8 in

Paver formula

Paver footprint (sq in) = (Paver width + joint) x (Paver length + joint)
Pavers = Area (sq ft) x 144 / Paver footprint x (1 + waste %)
Gravel base (cu yd) = Area x Base depth (in) / 12 / 27, Bedding sand (cu yd) = Area x Sand depth (in) / 12 / 27
Polymeric sand bags = Area / 75 sq ft per 50 lb bag (1/8 in joints)

Worked example

A 16 x 14 ft patio (224 sq ft) in 6 x 9 in pavers with 1/8 in joints: each paver occupies 6.125 x 9.125 = 55.9 sq in, so 144 / 55.9 = 2.58 pavers per square foot. 224 x 2.58 = 577 pavers, or 606 with 5% waste.

Base: 224 x (6 / 12) = 112 cubic feet of crushed stone, which is 4.15 cubic yards compacted; order about 5 yards loose to cover 20 percent compaction. Bedding sand at 1 in: 224 / 12 = 18.7 cubic feet, or 0.69 cubic yards. Polymeric sand: 224 / 75 = 3 bags.

Quick reference

Pavers per 100 sq ft with 1/8 in joints (no waste)
Paver sizeFootprint with joint (sq in)Per sq ftPer 100 sq ft
4 x 4 in17.08.46847
4 x 8 in33.54.30430
6 x 6 in37.53.84384
6 x 9 in55.92.58258
12 x 12 in147.00.9898
16 x 16 in260.00.5556
24 x 24 in582.00.2525

How to calculate pavers

Multiply the length and width of the area for square feet. Then work out the footprint of one paver including half a joint on each side: a 4 by 8 inch paver with 1/8 inch joints occupies 4.125 by 8.125 inches, or 33.5 square inches, so a square foot holds 4.3 pavers. Many suppliers sell by the square foot or by the pallet, so also note the coverage printed on the pallet tag.

Waste depends on the layout. A rectangular patio in a running bond needs about 5 percent for cuts along two edges. Herringbone, curves and circles cut pavers along every edge and need 10 to 15 percent. Pavers come on pallets of about 100 to 120 square feet weighing 2,500 to 3,000 lb, so the boom truck needs a spot near the work. Order every pallet from one production lot and keep a few spares, since colors change between runs.

Base, sand and joints

Excavate to the paver thickness plus the sand and base depth, sloping the subgrade 1/4 inch per foot away from the house. Compact the subgrade before anything goes on it. On clay or silt, lay a woven geotextile first so fines cannot pump up into the stone. Lay 4 to 6 inches of 3/4 inch minus crushed stone for a patio, or 8 to 12 inches for a driveway. Place it in lifts of 4 inches or less with two passes of a plate compactor per lift. Dense-graded stone compacts 15 to 25 percent, so order about 20 percent more than the compacted volume shown. A cubic yard weighs about 1.4 tons and the pit sells by the ton.

Screed exactly 1 inch of coarse concrete sand (ASTM C33) over the base. Mason sand and stone dust hold water and pump, and a thicker bed lets pavers settle and rut. Set the pavers, spike the edge restraint to the base every 12 inches, then run the plate compactor over the pavers with a pad to seat them. Sweep polymeric sand into the joints dry, compact again, and blow every grain off the faces; sand left on top sets as a haze that takes acid to remove. Mist in two or three passes until the joints refuse water, never flood, with no rain for 24 hours and temperatures above 32 F. Regular sand works too but washes out and grows weeds sooner.

What this calculator leaves out

Geotextile, edge restraint and its 10 inch spikes, and the 20 percent compaction allowance on the base. Excavation and haul-off: a 12 x 10 patio dug 7 inches deep is about 2.6 yards of dirt in the ground and about 3 in the truck. Plate compactor rental, a wet saw or splitter for the edge cuts, sealer, delivery, and the permit some towns want for a driveway apron.

Mistakes that cost money

  • Base compacted in one 6 in lift stays loose at the bottom; place it in lifts of 4 in or less, two passes each.
  • Polymeric sand left on the paver face when it is wetted sets as a white haze; blow every grain off before the first mist.
  • Flooding polymeric sand washes the binder out of the joints; mist in passes until the joints refuse water, and no rain for 24 hours.
  • No edge restraint: the outside courses creep and the joints open within a season; spike restraint to the base, not the sand.
  • Bedding sand piled thick to fix a wavy base: pavers settle into the thick spots and rut; fix the base, screed 1 in.
  • No geotextile on clay or silt: fines pump up into the base and the patio settles in two winters; lay woven fabric on the subgrade.

Key facts

  • A standard 4 x 8 in Holland paver covers 0.22 sq ft, so a square foot takes 4.5 pavers, or about 4.3 with 1/8 in joints.
  • A 12 x 12 in paver covers just under 1 sq ft; 100 sq ft needs about 98 with joints plus waste.
  • A patio base is 4 to 6 in of compacted crushed stone; driveways need 8 to 12 in.
  • One cubic yard of gravel covers 81 sq ft at 4 in deep, and one yard of sand covers 324 sq ft at 1 in.
  • A 50 lb bag of polymeric sand fills the joints of roughly 50 to 100 sq ft of pavers, depending on paver size and joint width.

Frequently asked questions

How many pavers do I need for 100 square feet?

About 430 of the common 4 x 8 in pavers with 1/8 in joints, or about 450 with 5% waste. For 12 x 12 in pavers, 98 plus waste, so about 103.

Why did my pavers turn white after the polymeric sand?

That is haze: polymeric sand left on the paver faces when the water hit it, so the binder set on the surface. A light haze wears off in a few months of rain and traffic; a heavy one takes a polymeric haze remover or diluted muriatic acid and a stiff brush. Next time blow every grain off the faces before the first mist, and mist rather than flood.

How much sand do I need under pavers?

A 1 in bed of coarse concrete sand: one cubic yard covers 324 sq ft. A 200 sq ft patio needs about 0.6 cubic yards.

How many bags of polymeric sand do I need?

One 50 lb bag per 50 to 100 sq ft with narrow 1/8 in joints on standard pavers. Wide joints or small pavers use much more; check the coverage chart on the bag.

Sources and references

Next steps for this project

  1. Excavation
  2. Gravel
  3. Rebar
  4. Concrete
  5. Concrete Cost
  6. Brick
  7. Mortar